Summary:
RailTel Corporation of India has secured contracts worth about ₹6.08 billion from Rail Vikas Nigam Limited for two integrated tunnel communication system projects. The orders cover SITC work across multiple tunnels and stations under two packages, including systems such as VHF communication, CCTV, public address, and emergency call points. Both projects are domestic and are slated for completion by April 12, 2028.
RailTel Corporation of India (RailTel) has reported securing several new contracts with a total value of about ₹6.08 billion. In a regulatory filing, the company stated that it has obtained letters of acceptance (LoAs) from Rail Vikas Nigam Limited (RVNL) for two significant infrastructure projects focused on integrated tunnel communication systems.
The first contract, estimated at roughly ₹3.09 billion, falls under Package 1 and includes the supply, installation, testing, and commissioning (SITC) of integrated communication systems for tunnels T-1 through T-7, along with related stations, covering a distance of 42.7 kilometres.
The second contract, valued at around ₹2.55 billion, is part of Package 2 and involves SITC activities for tunnels T-8 to T-11 and four stations, spanning 36 kilometres. This package includes systems such as very high frequency simplex communication, closed-circuit television, public address systems, and emergency call points.
Both projects are domestic assignments and are expected to be completed by April 12, 2028.
