Airtel Escalates on Tejas Network’s Letter Regarding Faulty Equipment

Airtel Escalates on Tejas Network’s Letter Regarding Faulty Equipment

Summary:
The dispute between Bharti Airtel and Tejas Networks has intensified after Airtel reiterated that Tejas’s equipment used in Bharat Sanchar Nigam Ltd (BSNL)’s 4G rollout, is “sub-standard” and causing interference in its 900 MHz network in Rajasthan. Tejas strongly refuted the claim, arguing that its radios meet all international and domestic emission norms and that the interference stems from improper site placement and spectrum overlap with BSNL. 

Airtel’s complaint, formalized in a letter dated November 14, 2025, has cited persistent network problems since December 2024 despite repeated technical reviews. The operator claims that Tejas equipment’s filter design for BSNL’s 800 MHz band does not conform to India’s 800 MHz downlink range (869–889 MHz), leading to emissions that encroach into Airtel’s 900 MHz uplink, affecting call quality and network reliability.  

Meanwhile, Tejas Networks insists its radios were tested and certified by accredited labs to meet 3GPP, TEC, and BSNL tender specifications, including strict out-of-band emission limits, and that the observed interference is a result of proximity between BSNL and Airtel towers rather than equipment faults.  

The core issue revolves around whether the root cause is technical non-conformance by an indigenous vendor, or a deployment and spectrum-management problem in a multi-operator environment. The disagreement comes at a time when India is pushing for use of local telecom equipment, raising broader questions about quality standards, compliance, and coexistence in densely populated spectrum bands. Given the serious allegations and rebuttals, resolution will likely require regulatory scrutiny, improved spectrum coordination and possibly hardware refinements to ensure seamless service across operators. 

Leave a Reply

Your email address will not be published. Required fields are marked *

RailTel wins contracts totaling Rs 2.17 billion
Telecom Infrastructure

RailTel wins contracts totaling Rs 2.17 billion

Summary: RailTel Corporation of India has secured two government contracts in Bihar worth a total of Rs 2.17 billion. These include a Rs 483.8 million project to establish a cyber security operations centre and maintain IT and operational systems for power distribution companies over five years, and a larger Rs 1.68 billion assignment to support […]

Read More
Reliance is reportedly collaborating with six banks in preparation for the anticipated IPO of Jio Platforms
Telecom Industry

Reliance is reportedly collaborating with six banks in preparation for the anticipated IPO of Jio Platforms

Summary: Reliance Industries Limited is working with six banks on the planned IPO of its telecom arm, Jio Platforms Limited, which could become India’s largest ever. The process has gained speed after regulatory changes allowing lower equity dilution, with estimates valuing Jio at up to $170 billion and a potential fundraising of about $4.3 billion. […]

Read More
Vibrant Village Programme II to undertake telecom infrastructure deployment in 47 villages along Nepal border
Telecom Infrastructure

Vibrant Village Programme II to undertake telecom infrastructure deployment in 47 villages along Nepal border

Summary: Under the Vibrant Village Programme II (VVP II), 47 border villages in Lakhimpur Kheri district of Uttar Pradesh will be developed with improved road and telecom connectivity. The initiative focuses on strengthening infrastructure, boosting livelihoods through tourism and skill development, and supporting local community groups. It will be implemented across strategically selected villages in […]

Read More
Copyright @ 2025 Bharatnet. All rights reserved.