BharatNet Phase 3 Tender- ITI, HFCL, TCIL, Pratap Technocrats Among the Bidders

BharatNet Phase 3 Tender- ITI, HFCL, TCIL, Pratap Technocrats Among the Bidders

TCIL, ITI Limited, and domestic optical fiber cable (OFC) manufacturers such as HFCL, Polycab, and Pratap Technocrats are among the key bidders for the third phase of the Indian government’s ambitious BharatNet program. Notably, Polycab, and HFCL have submitted solo bids, while 18 other bidders, including G R Infraprojects, Vindhya Telelinks, Pace Digitek Infra Private Limited, Rail Vikas Nigam Limited (RVNL), Bharat Electronics Limited, and Megha Engineering, have opted for consortium bids. 

A total of 21 bidders are competing under the BharatNet III program, covering regions such as Madhya Pradesh, Rajasthan, Uttar Pradesh (East and West), Karnataka, Uttarakhand, Bihar, Himachal Pradesh, West Bengal, Jammu & Kashmir, and the North East Regions I and II. The bids will undergo further technical evaluation by state-run Bharat Sanchar Nigam Limited (BSNL). 

In a recent interview, Sanjeev Kumar, Chairman of TCIL, stated that the company plans to bid for a majority of the packages, specifically targeting 6-7 packages. Mahendra Nahata, MD of HFCL, emphasized that the project offers a significant opportunity to boost demand for optical fiber cables, telecom products, system integration services, and ongoing maintenance, aligning with HFCL’s core strengths. 

Earlier this year, the Indian government launched the Rs 65,000-crore BharatNet III program. The tender, divided into 16 packages, closed on August 6, 2024. This initiative is part of the broader Rs 1.39 lakh crore BharatNet program, led by Prime Minister Narendra Modi’s government, aimed at enhancing last-mile broadband connectivity and upgrading the existing 164,000 gram panchayats, with plans to connect an additional 47,000 gram panchayats. 

The BharatNet III project features a three-tier structure: BSNL will provide Internet leased line bandwidth at 7,269 blocks; private players will manage middle-mile connectivity for 10 years, and last-mile connectivity will be delivered through the Udyami model. The project builds on earlier phases, with the Cabinet approving Rs 42,068 crore for BharatNet’s Phase-1 and Phase-2 projects in 2017. 

Leave a Reply

Your email address will not be published. Required fields are marked *

BharatNet Phase 3 News- BSNL Awards ₹5,649 Crore Contract to Polycab
Broadband

BharatNet Phase 3 News- BSNL Awards ₹5,649 Crore Contract to Polycab

Homegrown wire, cable, and electrical gear maker Polycab has won two contracts, cumulatively valued at Rs 5,649.36 crore (inclusive of GST), from government-owned Bharat Sanchar Nigam Limited (BSNL) for the deployment of a middle-mile network for Bharat Net under various packages.  ” Polycab India Limited emerges as the Lowest Bidder (L1) from Bharat Sanchar Nigam […]

Read More
BSNL Awards ₹5,000 Crore BharatNet Project to RVNL-Led Consortium
Broadband

BSNL Awards ₹5,000 Crore BharatNet Project to RVNL-Led Consortium

Bharat Sanchar Nigam Limited (BSNL), India’s state-owned telecom operator, has awarded a consortium led by Rail Vikas Nigam Limited (RVNL) a contract worth nearly ₹5,000 crore for the development of BharatNet’s middle-mile network. BharatNet, a government initiative, aims to bring high-speed broadband to unconnected villages across India. This contract pertains to Phase 3 of the […]

Read More
In-Flight WiFi Above 3000m Permitted by Indian Govt
Broadband

In-Flight WiFi Above 3000m Permitted by Indian Govt

The government clarified that in-flight passengers can access internet services via Wi-Fi only when electronic devices are permitted onboard, even after reaching an altitude of 3,000 meters in Indian airspace. According to the Flight and Maritime Connectivity Rules, 2018, in-flight service providers must enable mobile communication services above 3,000 meters to prevent interference with terrestrial […]

Read More